๐Ÿงธ 1D Project Part 1: Mini Hardware Project

Duration: Week 1 - 4

Briefing: Week 1 lab time

Weightage**: 4%, comprised of 3 parts.**

๐Ÿ“ Part A: Edimension Quiz (0.5%)

This is the first stage of MHP**.** You should fill and submit eDimension quiz questions in Week 1 tab (can collaborate, answer questions along the way)

๐Ÿ™‹โ€โ™‚๏ธ๐Ÿ™‹โ€โ™€๏ธ Part B: In-class Checkoff (0.5%)

You need to complete Week 1 in-class checkoff with your instructor or TA. It can be done solo or in pairs as well โ€“ with anyone in class, not necessarily your 1D group mates, showing that the circuit on breadboard works during Week 1 lab time.

Those on SHN or valid LOA need to reschedule with respective lab UTA when theyโ€™re back. You can check whether you have checked off here.

โš™๏ธ Part C: Hardware Submission (3%)

This is the final part**.** You need to submit your 1D Full Adder Hardware and demonstrate it to your Lab TAs as your 1D group, not the pairs you did for Week 1 checkoff.

Realise that MHP is part of 1D project

https://lh7-us.googleusercontent.com/dOE1YodbSxIV1Pr65ZRcz6E6NQT2kECUKX4lc6PSaEU8lorIyhJeknAn3OtNSmbQLb1SGCNH-ycStUJhB_YqSJ49XNaMzfl1sz3qTmvp_GMjSpPPYOBhb5wcz8e3IWwwG8L6e_0zHvur2wFh5YzEeVI